XE265C
| Availability: | |
|---|---|
| Quantity: | |
The newly upgraded XE265C hydraulic excavator has more power, lower fuel consumption and stronger working performance. It can be widely used in farmland water conservancy, river dredging, municipal construction and small mine construction, and can realize different operation requirements such as excavation, crushing and dismantling. The adaptability of working conditions has been further strengthened.
1. Ecological and economical
128.5kW high-power engine is more fuel saving.
New main pump can ensure high efficiency and reduced leakage.
Efficiency main valve increases relief pressure and reduces pressure loss.
Smart matching technology ensures higher operating efficiency and lower fuel consumption.
2. Multiple application
Different boom, stick and bucket combinations maximize utilization in different conditions
Multi-functional intelligent work tool control system can meet different operating requirements such as digging, breaking and dismantling.
Instantaneous boost function copes with complex working conditions.
3. Comfortable and safe
Air Conditioner and Heater with Double stage air filter ensure the appropriate temperature.
Silicone rubber shock absorber is adopted in the cab.
Air-suspension seat equipped with electric heating function.
Integrated control panel and large display screen provide multiple information.
| Description | Unit | Parameter value | |||
| Operating weight | kg | 25500 | |||
| Bucket capacity | m³ | 1.05~1.25 | |||
| Engine | Model | Engine | ISUZU | ||
| CC-6BG1TRP-05 | |||||
| No. of cylinders | --- | 6 | |||
| Output power | kW/ r/min | 135.5/2150 | |||
| torque/speed | N.m | 637/1800 | |||
| Displacement | L | 6.494 | |||
| Main performance | Travel speed(H/L) | km/h | 5.9/4.0 | ||
| Rotating speed | r/min | 11.3 | |||
| Gradeability | ° | ≤35 | |||
| Ground pressure | kPa | 50.1 | |||
| Bucket digging force | kN | 179 | |||
| Arm digging force | kN | 125 | |||
| Maximum traction | kN | 194 | |||
| Hydraulic system | Main pump | -- | 2 | ||
| Rated flow of main pump | L/min | 2×256 | |||
| Pressure of prime valve | MPa | 34.3/37 | |||
| Pressure of travel system | MPa | 34.3 | |||
| Pressure of swing system | MPa | 28 | |||
| Pressure of pilot system | MPa | 3.9 | |||
| Oil Capacity | Fuel tank capacity | L | 400 | ||
| Hydraulic tank capacity | L | 240 | |||
| Engine oil capacity | L | 25 | |||
| Appearance size | Overall length | mm | 10160 | ||
| Overall width | mm | 3190 | |||
| Overall height | mm | 3100 | |||
| Width of platform | mm | 2830 | |||
| Length of crawler | mm | 4640 | |||
| Overall width of chassis | mm | 3190 | |||
| Width of crawler | mm | 600 | |||
| Wheel base of crawler | mm | 3842 | |||
| Crawler gauge | mm | 2590 | |||
| Clearance under counterweight | mm | 1100 | |||
| Min. ground clearance | mm | 485 | |||
| Min. tail swing radius | mm | 2985 | |||
| Working scope | Max. digging height | mm | 9662 | ||
| Max. dumping height | mm | 6810 | |||
| Max. digging depth | mm | 6895 | |||
| Max. digging depth at the range of level 8 feet | mm | 6750 | |||
| Max. vertical wall digging depth | mm | 5480 | |||
| Max. digging reach | mm | 10240 | |||
| Min. swing radius | mm | 3850 | |||
1. Mining operations
Suitable for rock stripping and loading operations in small and medium-sized mines. Equipped with a 1.3m³ rock bucket, it has a digging force of 179kN. The reinforced chassis effectively handles harsh working conditions, with an average daily processing capacity of over 1,500 tons.
2. Infrastructure Construction
Suitable for road and railway embankment excavation and bridge foundation construction. The 132 kW engine, combined with an intelligent hydraulic system, reduces fuel consumption by 15% compared to the previous generation and improves operational efficiency by 35%.
3. Earthwork Projects
Used for foundation pit excavation and site leveling in real estate development zones and industrial parks. A working weight of 25.5 tons ensures operational stability, with a maximum digging depth of 6.8 meters.
4. Agricultural and Water Conservancy Engineering
Completes tasks such as river dredging and ditch excavation. Optional 1.0m³ enlarged bucket is available, offering good maneuverability and adaptability to muddy terrain operations.
Smart Operation: After a cold start, idle for 3 minutes to preheat, then begin operation once the water temperature reaches 50°C. Enabling the “Smart Power Control” system automatically optimizes energy consumption, achieving up to 12% energy savings.
Efficient Operation: In heavy-duty conditions, enable the “Dual Pump Combination” function; for precision work, switch to “Micro Operation Mode” to enhance accuracy.
Safety Standards: When working on slopes, keep the tracks perpendicular to the slope surface; water depth must not exceed the center of the track rollers; monitor real-time instrument alarm information.
Smart Maintenance: Clean the hydraulic filter every 500 hours; release hydraulic pressure when storing the machine for an extended period.
FAQ
1. HOW IS YOUR DELIVERY TIME?
In general circumstance, we can have an immediate delivery of regular machines for our clients within 7 days, because we have a variety of resources to check machines in stock, locally and nation widely, and to receive machines in timely manner. But for manufacturers/factories, it will take more than 30 days to produce the ordered machine.
2. WHICH PAYMENT TERMS CAN YOU ACCEPT?
Normally we can work on T/T term or L/ term, sometime DP term.
1)On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment, or against the copy of original B/L for long-term cooperating client.
2)On L/C term, a 100% irrevocable L/ C without "soft clauses"from an international recognized bank can be accepted. Please seek the advice from the individual sales manager whom you work with.
3. WHAT SERVICES CAN WE PROVIDE?
Accepted Delivery Terms: FOB,CFR,CIF;
Accepted Payment Currency:USD,EUR;
Accepted Payment Type: T/T,L/C,Western Union,Cash;
Language Spoken:English,Chinese
4. ENGINE WON'T START (STARTER MOTOR DOESN'T TURN)?
Priority checks: Loose or corroded battery terminals, insufficient battery voltage, blown fuses, and faulty starter relay/magnetic switch.
5. ENGINE FAILS TO START (STARTER MOTOR TURNS BUT ENGINE DOES NOT CRANK)?
Focus on fuel system inspection: Check for depleted diesel fuel, air in the fuel line, clogged diesel fuel filter (coarse/fine), and proper operation of the manual fuel pump.
6. ENGINE SUDDENLY STALLS DURING OPERATION?
Check for depleted fuel, severe fuel line blockage, or electrical faults (e.g., malfunctioning kill switch solenoid).