XR200E
| Availability: | |
|---|---|
| Quantity: | |
Product Introduction
As a multi-functional machine, XR200E can realize the quick switching of functions such as crowd cylinder, crowd winch, to meet more different construction needs. The rotary drive performance is increased by 11%, main winch by 18%, travelling drive by 20%, heat dissipation capacity by 1.4 times, and the working efficiency is much higher. The main and auxiliary winches both adopt single-row rope technology, the service life of wire rope is 2~4 times longer than that of multi-layer rope, which makes the cost lower.
Product Advantage
Outstanding overall stability: This model adopts a double-boom large parallelogram luffing structure, which increases the width of the luffing boom and extends the support range by 16%, ensuring more stable operation.
The drill mast adopts an extended large disc structure. These designs together significantly enhance the construction stability of the entire machine under rotation and rock penetration conditions.
Intelligent and humanized design: The XR200E is equipped with a powerful human-machine interaction system, featuring multi-mode control of the power head, one-click automatic centering, and bottom protection for the main hoist, making operation more convenient and effortless.
Meanwhile, it can be equipped with XCMG's "Drill Through the Cloud" mobile APP to achieve remote real-time monitoring of the equipment status.
Reliable durability and economy: Both the main and auxiliary winches adopt single-row rope technology. This technology can significantly extend the service life of steel wire ropes, which is said to be 2 to 4 times that of multi-layer ropes, helping to reduce usage costs.
Technical Parameters
| Type | Unit | Parameter | |
| Max. drilling diameter | m | 1.8 | |
| Max. drilling depth | m | 65 | |
| Engine | Model | / | 6HK1X |
| Power | kW | 212 | |
| Rotary drive | Max. output torque | kN.m | 210 |
| Rotary speed | r/min | 7-30 | |
| Crowd cylinder | Max. pull-down piston push | kN | 210 |
| Max. pull-down piston pull | kN | 210 | |
| Max. pull-down piston stroke | m | 4.8 | |
| Crowd winch | Max. pull-down piston push | kN | 210 |
| Max. pull-down piston pull | kN | 210 | |
| Max. pull-down piston stroke | m | 13 | |
| Main winch | Max. pulling force | kN | 190 |
| Max. speed | m/min | 75 | |
| Auxiliary winch | Max. pulling force | kN | 80 |
| Max. speed | m/min | 70 | |
| Mast inclination | Lateral/ forwards/ backwards | ° | ±4/5/15 |
| Undercarrige | Max. traveling speed | km/h | 1.9 |
| Max. grade ability | % | 40 | |
| Min. clearance | mm | 379 | |
| Track shoe width | mm | 700 | |
| Distance between tracks | mm | 2960-4200 | |
| Hydraulic system | Working pressure | MPa | 35 |
| Overall weight | Max. traveling speed of the overall unit | t | 70 |
| Dimension | Working condition | mm | 8800*4200*21615 |
| Transportation condition | mm | 16571*3000*3731 | |
Product Uses
Civil and industrial construction and municipal engineering: It is highly suitable for foundation pit support piles in building construction, municipal bridge foundations, etc.
Rail transit and infrastructure: It has performed stably in projects such as electrical tower pile foundations for subways and railways.
Power infrastructure construction: In the power tower pile project in the Northwest Gobi Desert, facing the tight geological conditions of the loess layer mixed with crushed stones and pebbles, the XR200E only needs 15-20 minutes to complete a pile with a depth of 5-6 meters, with high hole-forming efficiency, ensuring the project progress.
Construction in the special environment of the plateau: In the building support interlocking pile project in Lhasa, Xizang (at an altitude of about 3,650 meters), the XR200E is based on the plateau, with abundant power. On average, it can complete one hole per hour, and its efficiency is 40% higher than that of other equipment on the site, demonstrating the good adaptability and strong power of its engine in the plateau region.
Product Operate Guide
Personal protection: When operating a rotary drilling rig, be sure to fasten your safety belt.
Environmental survey: Before the operation, it is essential to survey the terrain in advance to ensure that the operation is within a controllable range.
Standard operation
Tips for going up and down slopes: When going up and down slopes, move at a constant speed, use low speed and small flow, and avoid sudden acceleration.
Downhill direction: When going downhill, the guide wheels should be in front to keep the upper tracks taut and enhance stability.
Mast position: When going up or down slopes, the mast must be lowered so that the working device can be quickly lowered in case of danger to stabilize the vehicle body.
FAQ
A: It is a powerful construction tool dedicated to the industrial and civil construction market, suitable for pile foundation operations in fields such as housing construction and municipal engineering. Among similar 20-ton-meter products, it has a strong construction capacity.
A: It adopts a double-boom large parallelogram luffing structure, widths the boom and increases the diameter of the drill mast support disc. These designs significantly enhance the stability of the entire machine during rotation and rock penetration conditions.
The XR200E is equipped with A human-machine interaction system, supporting multi-speed control of the power head, one-click automatic centering, and protection when the main hoist touches the bottom, among other functions. Meanwhile, it can be equipped with the "Drill Through the Cloud" mobile APP, allowing users to remotely monitor the device status in real time.
A: Although there is no dedicated maintenance guide for the XR200E in the search results, you can refer to the general suggestions for the XR200: including checking the engine oil, hydraulic oil, and coolant before starting, adding grease regularly, and having professional maintenance personnel carry out maintenance at the prescribed intervals.
A: When designing, XG took into account the convenience and comfort of operation, aiming to reduce the labor intensity of the operators. However, for specific operations, users still need to be familiar with the standard procedures, such as pre-startup inspection, engine preheating, track extension, and moving the chassis, etc.
As an E series product, the XR200E has seen improvements and upgrades compared to the XR200 in terms of torque, drilling capacity, main hoist speed, and intelligence level.