XE235C
| Availability: | |
|---|---|
| Quantity: | |
Product Introduction
The XE235C's core strengths lie in five key areas: powerful yet efficient performance, robust structural durability, outstanding fuel economy, comfortable and responsive operation, and straightforward maintenance. It sets the benchmark for value in the 23-tonne all-round excavator segment. With ample power, high efficiency, low fuel consumption, and excellent durability coupled with low maintenance requirements, it represents the cost-effective choice for medium-scale construction projects.
Product Advantage
Powerful and Efficient
Genuine Isuzu six-cylinder direct injection engine: CC-6BG1TRP, 128.5kW at 2100rpm, maximum torque 637N·m at 1800rpm. High torque at low revs ensures robust performance under heavy loads.
Intelligent Hydraulic Matching: Dual main pumps 2×246L/min, boom priority + precise flow distribution. Smooth compound movements boost loading/dumping efficiency by approximately 26%.
Exceptional Digging Force: Bucket digging force 176kN, stick digging force 125kN. Effortlessly tackles hard soil and rock excavation.
Robust and Durable Construction
Reinforced Working Equipment: Thickened critical areas on boom/dipper arm, finite element optimisation, new shaft stops for impact and deformation resistance.
Upgraded Undercarriage: Integral forged slewing ring housing, heavy-duty four-wheel track with dual-row track clamps for enhanced stability and extended service life.
C-Type Wear-Resistant Bucket: Rationalised stress distribution and high abrasion resistance, suited for demanding conditions like mining and crushing.
Hybrid Cooling: Parallel water and hydraulic oil cooling systems ensure sustained stability in high-temperature environments, preventing overheating and downtime.
Energy-efficient and fuel-saving, low operating costs
Electronic control optimisation: New controller + intelligent power matching reduces overall fuel consumption by approximately 15%, delivering greater fuel efficiency under identical operating conditions.
Large fuel tank: 400L capacity extends operational range, reduces refuelling frequency, and enhances shift efficiency.
Extended maintenance intervals: Key components require servicing less frequently, lowering maintenance costs and reducing downtime.
| Description | Unit | Parameters | |
| Model | Operating weight | kg | 23500 |
| Bucket capacity | m3 | 1.0-1.1 | |
| Engine | Engine model | CC-6BG1TRP | |
| Output power | Kw/rpm | 128.5/2100 | |
| Max.torque | N.m/rpm | 637/1800 | |
| Displacement | L | 6.494 | |
| Mian pertormance | Travel speed | km/h | 6.0/4.0 |
| Slewing speed | r/min | 12.1 | |
| Gradient capability | ° | ≤35° | |
| Ground pressure | kPa | 48.9 | |
| Digging capacity of tcuket | kN | 176 | |
| Digging capacity of tcuket rod | kN | 125 | |
| Max.traction | kN | 194.8 | |
| Hydraulic system | Main pump | Tow plunger pumps | |
| Rated flow of main pump | L/min | 2×246 | |
| Pressure of main safety valve | Mpa | 34.3/37 | |
| Pressure of traveling system | Mpa | 34.3 | |
| Pressure of swing system | Mpa | 25 | |
| Pressure of pilot system | Mpa | 3.9 | |
1. Large-scale earthworks (primary application)
Extensive excavation, dumping and transportation of earth and rock at construction sites
Site levelling, roadbed filling, slope trimming and shaping
High loading efficiency, the ultimate earthmoving machine
2. Municipal infrastructure projects
Urban road widening, demolition of old road surfaces, roadbed construction
Excavation and backfilling for gas, water supply, sewage and cable ducts
Renovation works for pavements, parks, and public squares
3. Property Development / Building Foundations
Excavation for high-rise residential and industrial building foundations
Basement earthworks, pile cap and strip footing excavation
Foundation backfilling and site clearance
4. Mining / Rock Excavation / Crushing Operations
Mountain stripping, quarrying, and crushed stone loading
Combined with breaker attachments for road demolition, rock breaking, and building demolition
Construction of mine access roads and slope stabilisation
5. Hydraulic Engineering & Waterway Works
River dredging, embankment reinforcement, slope protection excavation
Construction of reservoirs, fish ponds, and drainage ditches
Flood control emergency response and dam reinforcement
6. Rural & Township Development
Construction and widening of village roads
Excavation for homestead sites and livestock farm foundations
Agricultural water management, ditch renovation, and land reclamation
7. Attachment-Extended Operations (Multi-Purpose Machinery)
Breaker: Road surface, wall, and rock breaking
Grapple: Timber, scrap material, and straw handling
Auger: Tree planting pits and small pile holes
Ripper: Hard soil and weathered rock breaking
Starting and Preheating
Climb aboard and fasten your seatbelt
Engage the safety lock lever
Turn key to ON → Self-check → Start engine
Idle for 3–5 minutes, observing no fault codes or alarms on the instrument panel
Standard Operating Procedure (Applicable to both excavation and loading)
Positioning
Drive slowly to the work site and come to a complete stop.
Excavation
Lower boom → Retract stick → Tilt bucket to scoop soil smoothly; avoid forceful impact or stalling.
Lifting & Slewing
Raise boom → Slew to unloading position with fluid motion.
Unloading
Extend stick → Tilt bucket outward for complete discharge.
Reset
Swing and retract bucket to commence next cycle.
Travel Operation Guidelines
Speed selection: Switch between high/low gear based on terrain; use low gear for operation, high gear for relocation.
Maintain stability by keeping boom lowered during travel.
Approach slopes head-on; never traverse sideways or climb diagonally.
Reduce speed when turning; avoid abrupt in-place slewing.
During extended relocations, prevent track overheating.
1. WHO ARE WE?
XUZHOU SHANGHENG ENGINEERING MACHINERY CO.,LTD is a leading construction machinery exporter,located in Xuzhou city,Jiangsu province where Xuzhou Construction Machinery Group Inc in. We have the domestic agency rights of them more than 10years,based on the advantage of them,we also estabish long-time business with other famous brands.
2. HOW IS YOUR PRICE COMPARED WITH MANUFACTURERS/FACTORIES?
We work as the leading dealers of various leading China construction machinery manufacturers/ factories, and are constantly treated with best dealership price. From numerous comparison and feedbacks from clients, our price is more competitive than the price from manufacturers/factories.
3. HOW IS YOUR DELIVERY TIME?
In general circumstance, we can have an immediate delivery of regular machines for our clients within 7 days, because we have a variety of resources to check machines in stock, locally and nation widely, and to receive machines in timely manner. But for manufacturers/factories, it will take more than 30 days to produce the ordered machine.
4. WHAT IS THE RECOMMENDED REPLACEMENT CYCLE FOR OIL AND FILTERS?
Strictly adhere to the specifications outlined in the Operation and Maintenance Manual. Appropriately shorten the replacement cycle based on the severity of the operating environment (e.g., dusty, high-temperature conditions).
5. HOW TO SELECT THE CORRECT HYDRAULIC OIL AND ENGINE OIL?
Purchase genuine fluids matching the brand, grade, and specifications (e.g., viscosity grade, API/ISO standards) specified in the manual. Never mix different brands or grades.
6. WHAT PRECAUTIONS SHOULD BE TAKEN FOR LONG-TERM EQUIPMENT STORAGE?
Clean the equipment, drain all coolant (or fill with antifreeze), disconnect the battery negative terminal, fully retract all cylinder piston rods and apply rust-preventative oil, and elevate tires to prevent contact with the ground.