XLC150
| Availability: | |
|---|---|
| Quantity: | |
The XLC150 crawler crane is a cost‑effective medium‑tonnage lattice‑boom lifting equipment, widely applied for diversified construction hoisting tasks. Its maximum rated lifting capacity reaches 150 tons under main‑boom working condition, with peak lifting moment of 874.8 t·m. The main boom ranges from 20 m to 77 m; fixed jib covers 13‑31 m, and optional tower jib further expands working range to satisfy high‑altitude and long‑radius hoisting requirements.
Adopting high‑strength lattice boom structure, the machine realizes outstanding anti‑deformation performance under heavy‑load conditions. It applies EGR engine technology without urea injection, lowering daily operating and maintenance expenses for global customers. The one‑key mast raising function simplifies on‑site assembly procedures and shortens setup time significantly.
Transport‑optimized modular design is one of its core highlights. Main unit transport weight is only 33.5 tons with transport width controlled within 3 meters. Multi‑nesting boom‑section transport reduces total shipping quantity; full‑configuration shipment only requires 5 trucks, which greatly lowers overseas break‑bulk transportation cost.
Large‑size crawler chassis improves ground contact area with average ground pressure down to 0.095 MPa, adapting to soft construction‑site ground. Complete safety monitoring system, human‑centered cab layout and easy‑access maintenance layout improve onsite operation safety and service efficiency. It has become popular main‑force equipment for global construction contractors and crane‑rental enterprises.
150‑ton main‑boom rated lifting capacity, max lifting moment 874.8 t·m, main boom up to 77 m. Supports fixed jib and optional tower jib working modes. Fixed‑jib max capacity reaches 50 tons, meeting steel‑structure installation, tower‑section hoisting and complex long‑radius lifting.
Equipped with high‑reliable diesel engine adopting EGR technology, no urea additive required. Stable power output, low fuel consumption and fewer consumable parts, effectively reducing long‑term operational expenditure for rental‑oriented customers.
Main unit transport weight 33.5 t, transport width ≤3 m, fits standard transport trailers. Multi‑nesting boom‑section design reduces component quantity; full‑configuration shipment only needs 5 transport vehicles, greatly cutting overseas logistics and break‑bulk shipping cost.
One‑key mast raising & recovery function simplifies assembly work and saves setup time. Symmetrical box‑type turntable with optimized mechanical‑electrical‑hydraulic layout. Maintenance accessibility improved by over 80%, convenient for daily inspection and component replacement.
Large crawler chassis with low average ground pressure adapts to soft, uneven construction‑site ground. 360° continuous slewing, multi‑level counterweight combinations for flexible load adjustment. Standard load‑moment limiter, height limit, hook anti‑fall protection and real‑time fault‑diagnosis system guarantee safe heavy‑load operation.
Item | Specification |
|---|---|
Model | XLC150 |
Max Rated Lifting Capacity(Main Boom) | 150 Ton |
Max Rated Lifting Capacity(Fixed Jib) | 50 Ton |
Max Rated Lifting Capacity(Boom‑end Sheave) | 13.5 Ton |
Max Lifting Moment | 874.8 t·m |
Main Boom Length | 20‑77 m |
Fixed Jib Length | 13‑31 m |
Max Main Boom + Fixed Jib Combination | 53+31 m |
Optional Tower Jib Range | 22‑52 m |
Engine Rated Power | 265 kW |
Max Hoisting Single‑Rope Speed | 120 m/min |
Max Luffing Single‑Rope Speed | 60 m/min |
Max Slewing Speed | 1.0 rpm |
Max Travel Speed | 1.3 km/h |
Average Ground Pressure | 0.095 MPa |
Full‑Configuration Operating Weight | 128 Ton |
Main Unit Transport Weight | 33.5 Ton |
Max Transport Width | 3 m |
Gradeability | 30% |
Packing Mode | Split nude packing for break‑bulk sea shipment |
Note: All parameters under standard configuration. Actual performance varies with boom/jib combination, counterweight setting and ground conditions. Tower jib is optional attachment.
‑ Steel‑Structure Construction: Large steel frame hoisting, factory steel‑structure integral installation
‑ Bridge & Municipal Engineering: Bridge segment lifting, viaduct construction, urban infrastructure project
‑ Wind‑Power Project: On‑shore wind‑turbine tower‑section and nacelle hoisting
‑ Plant & Power‑Station Construction: Equipment installation for thermal power plants and industrial workshops
‑ Oil & Chemical Project: Medium‑sized petrochemical equipment placement and module lifting
‑ Engineering Rental Business: Short‑term & long‑term leasing for medium‑and‑large‑scale construction projects
Evaluate site ground bearing capacity. Reinforce soft ground when necessary. Inspect lattice boom sections, pin shafts, wire ropes, hydraulic pipelines and engine status. Verify load‑moment limiter, height‑limit and emergency‑stop functions before startup.
Complete modular assembly strictly according to official assembly manual. Use one‑key mast‑raising function to finish mast setup. Confirm boom, jib and counterweight configuration match actual working‑condition requirements. Perform no‑load commissioning of hoisting, luffing, slewing and travelling functions.
Operate strictly following official load chart. Overload and over‑radius lifting are strictly forbidden. Conduct low‑position trial‑lift before formal hoisting. Keep smooth operation, avoid sharp jerk and emergency stop during compound movements. Monitor real‑time safety alarm signals continuously.
Only perform short‑distance travelling under permitted working‑conditions. Keep lifted load close to ground, reduce travelling speed. Avoid steep slopes and severely uneven ground.
Check boom welding seams, pin‑shaft connections and wire‑rope wear status daily. Inspect hydraulic system for oil leakage. Complete regular engine service, filter replacement and lubrication for all moving points.
Warning: Only certified professional operators can operate XLC150 crawler crane. Ground treatment must be completed before heavy‑load hoisting.
Q1: What is the max main‑boom length and lifting moment of XLC150?
A: Max main‑boom length reaches 77 m, maximum lifting moment is 874.8 t·m, rated main‑boom lifting capacity 150 tons.
Q2: Does XLC150 need urea for engine operation?
A: No. It adopts EGR engine solution without urea injection, lowering daily operating cost.
Q3: What jib options are available?
A: Standard fixed jib 13‑31 m; tower jib is optional for extended working height and radius.
Q4: What about overseas transportation condition?
A: Modular split‑transport design. Main unit transport width within 3 m. Full‑set machine can be shipped by break‑bulk sea transport. We provide complete export documents.
Q5: What kind of projects is XLC150 suitable for?
A: Widely used for steel‑structure, bridge, municipal, on‑shore wind‑power, plant and petro‑chemical medium‑tonnage hoisting projects.
Final price of XLC150 crawler crane depends on boom‑jib configuration, optional tower jib, counterweight combination, delivery terms, order quantity and destination‑country import policies. No fixed retail price. Please send your actual working‑condition and configuration requirements, we will provide official detailed quotation and one‑stop export‑service solution.