XCA1200
| Availability: | |
|---|---|
| Quantity: | |
Product Introduction
The XCA1200 is primarily designed for wind turbine installation and can flexibly switch between general-purpose operations and specific wind turbine models. It pioneers a self-folding boom specifically engineered for wind power applications, capable of completing automatic folding within 25 minutes. This enables the machine to transport all operational booms between sites, with the shortest overall packing time requiring just 2 hours, significantly reducing relocation costs.
Product Advantage
The XCA1200 is a powerful and versatile all-terrain crane. This crane is specifically designed to handle heavy lifting tasks in a wide range of construction and industrial projects. With its advanced technology and exceptional performance, the XCA1200 is highly regarded in the industry.
The XCA1200 features an impressive lifting capacity and a long boom reach, making it suitable for lifting heavy loads at significant heights. Equipped with a telescopic boom that can extend to considerable lengths, this crane allows for efficient lifting and precise placement of materials. Its exceptional load chart and precise control systems ensure safe and accurate lifting operations.
Technical Parameters
| Item | Parameter | Unit |
| Overall length | 26300 | mm |
| Overall width | 13000 | mm |
| Overall height | 8460 | mm |
| Maximum rated lifting weight | 1200 | ton |
| Maximum lifting height - full outrigger | 110 | m |
| Maximum lifting capacity | >400 | ton |
| Fuel Tank Capacity | 500 | L |
| Boom Length | 18.5-102 | m |
| Rated power | 482 | kw |
| Max. output torque | 3000 | N.m |
| Max. grade ability | 38 | % |
| Max. travel speed | 80 | Km/h |
Product Uses
1. Wind Turbine Installation and Maintenance
The XCA1200 is specifically engineered for installing and maintaining 2.0-2.5MW wind turbines. Its 7-section 89-meter main boom and self-folding 25.3-meter wind turbine boom effortlessly handle 2.5MW wind power construction requirements. It achieved an industry record by installing one 2.0MW turbine per day at an Inner Mongolia wind farm, completing installations at a rate of one turbine every day and a half.
2. Large-Scale Infrastructure Construction
Widely deployed at major construction sites like highways and bridges, it handles heavy precast components, large steel sections, and other building materials. Its exceptional lifting capacity and extended boom configurations effectively tackle long-span, high-difficulty hoisting tasks.
3. Large Equipment Lifting for Petrochemical Projects
In petrochemical plants and similar projects, it handles the lifting of large reaction towers, heavy pipes, and critical equipment. Its precise micro-movement capability and outstanding stability ensure safe installation and removal of large equipment within confined factory spaces, guaranteeing accurate positioning of key machinery.
4. Operations in Complex Terrain and Harsh Road Conditions
With robust off-road capabilities and oil-gas suspension, the XCA1200 adapts to demanding terrain like mountains, hills, and muddy post-rain conditions for both relocation and operation.
5. Efficient Relocation and Rapid Deployment
The XCA1200 delivers industry-leading relocation efficiency. Its globally pioneering self-folding wind turbine arm technology enables transport with the arm attached. A single-button operation allows the arm to flip into position without requiring auxiliary vehicles.
Product Operate Guide
XCA1200 operation must be strictly standardized. Before commencing work, ensure all outriggers are fully extended and supported on solid, level ground. Continuously monitor the torque limiter during operation; overloading is strictly prohibited. Use the intelligent control system to smoothly operate the boom, paying particular attention to the smart retraction and extension functions of its automatic folding boom structure.
FAQ
1. WHAT FLUIDS SHOULD BE CHECKED BEFORE STARTING WORK EACH DAY?
Check whether the levels of engine oil, coolant, hydraulic fluid, fuel, and brake fluid are within the standard range.
2. HOW TO PROPERLY INSPECT TIRES OR TRACKS?
Check if tire pressure is normal and if the tread has any cuts or abnormal wear; check if track tension is appropriate and if track plates or pins show damage or excessive wear.
3. CAN I PERFORM ALL MAINTENANCE MYSELF?
Simple daily checks are acceptable, but complex maintenance must be performed by trained professionals.
4. WHAT PRECAUTIONS SHOULD BE TAKEN WHEN STARTING THE ENGINE?
Each start attempt should not exceed 15 seconds, with at least 1 minute between attempts. If three consecutive starts fail, stop and investigate the cause.
5. ARE THERE SPECIAL STEPS FOR STARTING THE MACHINE IN COLD WEATHER?
Preheat the engine first. Use the correct low-temperature fuel and oil. Avoid revving the engine at high throttle. Allow the engine to run at low to medium speeds until the coolant temperature and oil pressure reach normal ranges.
6. WHAT PRECAUTIONS SHOULD BE TAKEN DURING TRAVEL OPERATIONS?
Sound the horn to alert surroundings before moving off. Travel at low speeds on slopes, uneven terrain, or soft ground. Avoid sharp turns to prevent tipping.