XGC11000
| Availability: | |
|---|---|
| Quantity: | |
Product Introduction
The XGC11000 boasts an impressive lifting capacity and a long boom reach, making it suitable for lifting extremely heavy loads at great heights. Equipped with a robust and sturdy crawler chassis, this crane offers excellent stability and maneuverability on various terrains. Its exceptional load chart and precise control systems ensure safe and precise lifting operations.
Product Advantage
1. Exceptional Lifting Capacity: The XGC11000 crane boasts a rated lifting capacity of 1,100 tons, capable of handling the lifting demands of various large-scale projects.
2. High Flexibility and Adjustability: Equipped with multi-section telescopic booms, the crane allows for adjustable reach based on operational requirements, delivering expanded working range and enhanced adaptability.
3. Advanced Technology and Safety Features: Incorporating proprietary advanced technology and safety systems—such as an intelligent wind speed detection system, heavy-load protection system, and anti-slip system—this crane ensures a safer, more reliable operating environment.
Technical Parameters
| Item | Unit | Parameter |
| Parameter item | - | XGC11000 |
| Performance parameters | ||
| Main boon rated liad | (t) | 650 |
| Fixed jib rated lifting weight | (t) | 330 |
| Luffing jib maximum rated lifting weight | (t) | 240 |
| Max Lifting Moment | (t.m) | 10800 |
| Tower jib maximum lifting weight | (t) | 230 |
| Working condition of single arm end pulley maximum rated lifting weight | (t) | 170 |
| Dimension parameter | ||
| Main boom length | (m) | 24~96 |
| The main luffing Angle | (°) | 30~84 |
| Fixed jib length | (m) | 66~108 |
| Tower jib length | (m) | 30-66 |
| Operating dimension(L*W*H) | (m) | 12×3.3×3.4 |
| Fixed jib installation Angle | (°) | |
| Special deputy arm length | (m) | 48-108+24-96 |
| Speed parameter | ||
| The biggest single rope hoist speed | (m/min) | 130 |
| The boom luffer maximum speed of single rope | (m/min) | 2*56 |
| Deputy arm luffing mechanism's largest single rope speed | (m/min) | 130 |
| Maximum turning speed | (r/min) | 0.7 |
Product Uses
1. Wind Power Installation
The XGC11000 is a dominant force in wind farm construction across China, including regions like Shandong, Inner Mongolia, and Xinjiang. It excels in installing 3-5MW wind turbine components, hoisting nacelles weighing up to 130 tons to heights of 105 meters. Its capability to operate in extreme cold, down to -30°C, makes it reliable for various demanding environments.
2.Bridge Construction
This crane is effective in urban viaduct and bridge projects within confined spaces. It demonstrates precision in dual-machine协同作业 (collaborative operation), capable of lifting 60-ton precast concrete girders and placing them with millimeter-level accuracy. Its compact setup and zero additional counterweight option enhance efficiency in congested areas.
3. Nuclear Power Projects
The XGC11000 contributes to the construction of key nuclear facilities, such as the "Hualong One" reactor. It handles precise placement of critical components like heat exchangers (7.3m tall, 9.4 tons) inside containment vessels at over 37 meters high. Its long main boom (up to 114m) and ability to lift 208 tons at a 38-meter radius ensure efficient and safe execution of complex lifts.
Product Operate Guide
Operating the XGC11000 requires certified personnel. Always follow the rated capacity chart and ensure the ground is firm and level. Use outriggers fully with pads. Maintain clear communication with your signaler during lifts. Never exceed load limits or swing a load over personnel.
FAQ
1. WHAT SHOULD BE NOTED FOR BATTERY MAINTENANCE?
Keep the terminals clean, regularly check the electrolyte level and specific gravity, and disconnect the negative terminal during prolonged storage.
2. HOW TO TROUBLESHOOT A MALFUNCTIONING LIGHTING SYSTEM?
Inspect fuses, bulbs, switches, and wiring connections. Use a multimeter to measure voltage and continuity.
3. WHAT SHOULD BE NOTED WHEN ADJUSTING TRACKS?
Adjust on level ground, maintain proper tension, and regularly inspect track pins and bushings for wear.
4. WHAT PRECAUTIONS SHOULD BE TAKEN DURING NIGHT OPERATIONS?
Ensure lighting systems are functional, set up clear warning signs, maintain open communication channels, and remain vigilant of the surrounding environment.
5. HOW TO ENSURE SAFETY WHEN WORKING NEAR HIGH-VOLTAGE LINES?
Maintain a safe distance, set up warning signs, assign a dedicated signaler when necessary, and use insulated protective equipment.
6. HOW TO PROPERLY STORE EQUIPMENT?
Clean the equipment, fill fuel tanks, drain water from reservoirs, apply rust-proofing to exposed metal parts, and start the engine once a month.